




- Existing asset with earnings history
- Experienced operator
- Secured feed-in tariff under the EEG
Welcome note

Dear prospective investors, dear investors,
With the VRE Odervorland Windkraft project, the MLK Gruppe continues its initiatives for profitable participation by local residents in the Jacobsdorf wind suitability area. After discounted tariffs for local residents and an attractive community savings project, the MLK Gruppe is now presenting an investment opportunity that offers even better earnings prospects than its previous offers. Interest of 4.30% p.a. is paid on a subordinated loan that you grant to the VRE Odervorland Windkraft wind turbine. The subordinated loan is intended to be repaid by the end of 2028, with repayment beginning in the 5th year of the term of the investment (Vermögensanlage).
We launched this project in particular for local residents of the wind suitability area in Jacobsdorf. For this reason, we are offering the investment exclusively to local residents – that is, residents of the municipality of Jacobsdorf – during the first two months after going online. Only after that will we open the offer to other interested parties as well.
The aim of the project is an investment that gives participants the chance of a profitable return on their money. Of course, this project also carries risks: as this is a subordinated loan that is repaid from the revenue generated by operating the wind turbine, repayment depends on the turbine not failing and not suffering from a prolonged period of low wind. Unforeseen costs can also jeopardise the project. But we will do everything we can to bring the project to a successful conclusion.
The advantages of this investment are:
The wind turbine, its revenue and its costs are known, confirmed and analysed on the basis of long-term operation.
The calculation is based in particular on the average revenue from the years 2017 to 2019.
Until the end of 2028, the turbine receives a statutory feed-in tariff, which remains at the same level until then.
So-called grid security measures are compensated by the grid operator.
As this is an older turbine, the newer rules on so-called negative electricity prices do not apply. There are therefore no hidden reductions in revenue.
To be protected against nasty surprises, the turbine has a full maintenance contract that also covers major components.
The site is secured by a long-term usage agreement.
VRE Odervorland Windkraft is managed by an experienced operations manager who got the best out of the operation.
No distributions are planned until the loan has been repaid in full, so that the surplus generated is set aside as a liquidity reserve.
Since 2007, the MLK Gruppe has built more than thirty wind turbines at the Jacobsdorf site and has operated them ever since. In other words: there is always someone responsible here who is genuinely available when needed.
The VRE Odervorland Windkraft project was specially selected and provided for this investment opportunity. Participation in the project complements the MLK Gruppe's support programme for local residents, this time with a project that allows more interest income than, for example, the community savings project offered in 2020, which the MLK Gruppe implemented with DKB. However, higher risks also have to be accepted. We ask you to bear this in mind when making an investment decision.
We would be delighted if you joined us!
Yours, Prof. Dr. Walter Delabar
Managing Director, VRE Odervorland Windkraft GmbH & Co. KG
The project company
The wind turbine is operated by VRE Odervorland Windkraft GmbH & Co. KG, based in Jacobsdorf, Brandenburg, which was founded exclusively for the purpose of operating this turbine. The company is registered with the local court (Amtsgericht) of Frankfurt (Oder) under commercial register number HRA 3990 FF. It is represented by its general partner with personal liability, Ventus Regenerative Energien GmbH, based in Erkelenz, North Rhine-Westphalia (Amtsgericht Mönchengladbach HRB 9189). The managing director is Prof. Dr. Walter Delabar. The sole shareholder is Mr Heinrich Lohmann, the founder and managing director of the MLK Gruppe.
The project
In 2008, the MLK Gruppe put the VRE Odervorland Windkraft wind turbine into operation together with two further turbines, which were taken over by MLK Windpark Sieversdorf Nr. 51 GmbH & Co. KG. Both companies have formed a pool through which the feed-in revenue is divided as fairly as possible between the operating companies. The revenue is divided into thirds between the three turbines. Regardless of which turbine generates how much electricity, each receives the same revenue as the other two.
At the time, a Vestas V90 turbine was built with a rotor diameter of 90 metres and a hub height of 105 metres, and it is still in operation today.
Under the Renewable Energy Sources Act (EEG), VRE Odervorland Windkraft receives a secured feed-in tariff of 8.43 cents per kilowatt hour fed in up to and including 2028. The electricity is fed into the EDIS grid. The electricity fed in is marketed by the direct marketer Naturstrom. Average annual electricity feed-in is approximately 3.9 million kilowatt hours. Because of the pool agreement, slightly more than 4.1 million kilowatt hours are attributed to VRE Odervorland Windkraft each year.
The project is secured by a long-term lease agreement. The wind turbine is maintained by the manufacturer Vestas under a full maintenance contract (AOM 4000). At the same time, operation is protected by an insurance package against loss of revenue and repair costs. The turbine is monitored by Regenerative Energien Zernsee GmbH & Co. KG, based in Berlin, which also maintains an office on site and likewise belongs to the MLK Gruppe.
The project was financed with a loan from Deutsche Kreditbank AG (DKB). The outstanding financing amounted to 729,913 euros as at 31.12.2019. As part of the financing, the wind turbine has been assigned to the bank as security, and DKB has contractually secured priority over the revenue. Subordinated lenders therefore rank behind the bank for as long as the bank financing has not been repaid. Repayment to the bank amounts to approx. 130,000 euros per year. The financing expires in mid-2025.
The general operating risks of a turbine include periods of low wind and early decommissioning of the turbine. Although the risk of decommissioning increases with the age of the turbine, it is largely minimised by the full maintenance contract and insurance cover. Should the turbine nevertheless be decommissioned before 2028 for technical reasons (other reasons are hardly conceivable), replacing the old turbine with a new one is possible and, where appropriate, sensible. Since the old turbine has secured the site, it is very likely that any outstanding obligations under the subordinated loan that are not covered by reserves can be passed on to the new project.
In 2020, Mr Heinrich Lohmann, as shareholder, took over the VRE Odervorland Windkraft turbine from the previous owners. In addition, the general partner with personal liability was replaced. Both were done in order to be able to offer a further participation opportunity to local residents.
The project company offers investors a subordinated loan up to a total amount of 400,000 euros. Amounts between 250 and 25,000 euros can be invested. The loan bears interest at a rate of 4.30% p.a.. The term ends on 31.12.2028. Interest is paid annually in arrears on 31.03. of each year, first due on 31.03.2022. Repayment is made in instalments, first on 31.03.2026 with an amount of 70,000 euros. In the following years, a further 110,000 euros is repaid each year in arrears on 31.03. Interest payments decrease with each repayment of the loan.
The primary purpose of the loan is to refinance the company's equity employed and to secure the ongoing operation of the wind turbine in Jacobsdorf for generating electricity from renewable energy, which is fed into the public grid and remunerated under the EEG. The turbine has already been completed and was put into operation in 2008.
The issuer is a so-called project company, that is, a company founded specifically to carry out this project and which otherwise conducts no other business. The operation of the wind turbine is intended to generate revenue in order to meet the claims of the subordinated lenders (“investors”) to interest payments and repayment of the subordinated loan principal.
Investors are investing in a wind turbine from an internationally renowned manufacturer that has already been built and has been in operation since 2008. The term is designed to run until the end of EEG support on 31.12.2028. The DKB loan will have been repaid by September 2025, so that from that point a further buffer is available for the repayment of the subordinated loan.
The project company has submitted the following projected calculation:

The revenue forecast is based on the average feed-in of the years 2017 to 2019, which were, however, rather low in wind. From today's perspective, there is no risk of the VRE Odervorland Windkraft turbine being hemmed in by new turbines built subsequently in the wind suitability area, as the suitability area does not currently permit any new sites in this location.
Based on the average feed-in for 2017 to 2019, annual revenue of approx. 298,000 euros was assumed. Experience shows that annual fluctuations in revenue, owing to the varying wind supply, are around 10 per cent.
The calculated costs are based on the experience and figures of past years. The main items affecting liquidity are repayment, interest payments and maintenance. Leases, operations management and electricity supply are also taken into account. Bookkeeping and the annual financial statements are outsourced and handled by a tax advisory firm with extensive industry knowledge.
You can see the annual surplus in the line “free liquidity” (freie Liquidität), and the available liquidity in the last line. As no distribution is made, any deficits are absorbed by the reserve.
From 31.03.2026, repayment of the subordinated loan then begins and will be completed by the end of 2028. The entire plan is geared towards holding buffers for contingencies and securing repayment of the subordinated loan as far as possible. Experience shows that the company's result can fluctuate by around 10 per cent. Further deviations cannot be ruled out.
Even though the wind turbine has been in operation since 2008 and is intended to remain in operation for at least another eight years, despite all caution, loss of revenue or unforeseeable costs cannot be ruled out, which in the extreme case can lead to the total loss of the investment.
Risk profile
Construction risk: Not apparent. The turbine has been approved, built and operated since 2008; planning errors or technical defects, unless remedied, have not been identified to date.
Operating risks: Operating risks are largely known owing to the many years of operation. Revenue and costs from operation are known.
Risk of failure: The risk of failure has been minimised by concluding a full maintenance contract. This covers the replacement of major components such as the gearbox or generator. In addition, there is insurance that covers further failures. Further risks are minimised by regular maintenance and expert inspections. Early decommissioning is therefore largely ruled out.
Revenue risk: The company's revenue is kept at the level of the sister turbines by the pool agreement. Revenue is fixed by statutory provisions in the Renewable Energy Sources Act (EEG) and is legally secured. The purchase of the electricity by the grid operator is regulated by law (EEG). Marketing by the direct marketer is governed by contract.
Securing of rights: The company's site rights are guaranteed by a long-term usage agreement.
Decommissioning: Early decommissioning cannot be completely ruled out and is one of the general operating risks of a wind turbine. Owing to the age of the turbine, this risk increases. Should there be no alternative to decommissioning the turbine despite the multiple safeguards, replacing the old turbine with a new one would be an option, which, owing to the securing of rights, would then have to assume the obligations of the old turbine.
| Term | Interest | Repayment | Interest date | Maturity |
|---|---|---|---|---|
| 8 years | 4.30 % p. a. | Instalment loan | 31.03. annually (first on 31.03.2022) | 31.12.2028 |
| Type of loan | Instalment loan |
|---|---|
| Interest payment frequency | annually |
| Available from | 30.03.2021 |
Downloads
Your personal payment plan (4.30 % interest p. a.)
| Year | Date | Payment (gross) | Interest | Repayment | Status |
|---|
Example calculation based on the terms, without accrued interest or a different first interest period; amounts rounded. Only the loan agreement and the investment information sheet (Vermögensanlagen-Informationsblatt) are authoritative. Taxes are not taken into account.