
- High-return climate protection
- Stability through a fixed feed-in tariff
- Regional, sustainable energy generation
Welcome note
.jpg)
Dear investors,
As early as the 1980s, as a young farmer, I was convinced of the potential of wind energy and realised my vision of equipping the farm with its first wind turbine. This meant the farm was supplied with renewable electricity. At that time I organised citizens' initiatives to give local residents the chance to take part in expanding the turbines.
With Prowind GmbH, founded in 2000, the concept was developed further and responsibility was spread across several shoulders.
Prowind has now grown to more than 180 employees and continues to specialise in community energy. In view of the challenges ahead, this focus seems more relevant than ever. Our vision is to be successful with a clear conscience and with the participation of regional partners, and in this way to make green energy possible for our lives.
We support every project from project planning and development through financing and construction to the smooth operation of the wind turbines.
We secure good returns by keeping the projects in our own portfolio and managing them from a single source.
Today you can take part in financing the Bürgerwindpark Ostenfelde (Ennigerloh), Warendorf district, North Rhine-Westphalia (NRW).
Together with you, we want to drive forward the energy transition and, with your investment, create a liveable future for the next generations.
Johannes Busmann
Managing Director of Ostenfelde Bürgerwind GmbH
Opportunities and risks
| Opportunities | Risks |
|---|---|
|
|
A wind farm consisting of four wind turbines ("WTs") is being built in Ennigerloh, North Rhine-Westphalia. One of the four wind turbines in the wind farm is not part of this financing. The three WTs to be financed by this investment (Vermögensanlage), made by the manufacturer Vestas Wind Systems A/S, of the type Vestas V 162-6.2 with a rated output of 6.2 MW each, have a total rated output of 18.6 MW. Commissioning is expected to take place in the third quarter of 2025.
The planned wind farm is located west of Beelener Straße K 2, between the Ostenfelde district of the town of Ennigerloh and the municipality of Beelen to the north. There are no residential areas in the immediate vicinity of the planned WT sites. To the south-west of the applied-for WTs, at a distance of approx. 2.5 km, lies the district of Ostenfelde, which belongs to the town of Ennigerloh, which is located approx. 6.1 km to the south-west.
The initial permit was issued in October 2023. An application for an amendment permit under the simplified procedure pursuant to Section 16 BImSchG in conjunction with Section 6 WindBG was then submitted to the Warendorf district. The amendment permit is expected to be received in May 2024.
To implement the project, a general contractor agreement and an agreement for commercial and technical operational management were concluded with Prowind GmbH.
Prowind was awarded a contract for the wind farm in the tender of the Federal Network Agency (Bundesnetzagentur) at 7.32 cents/kWh. The gross remuneration of 9.1 cents/kWh (EEG award x correction factor) results from the site quality assessment.
The grid connection requirements and the grid connection commitment are already in place.
Use of funds
The citizens' capital raised serves the project as economic equity
for the construction of the wind farm. Investments of between 250 and 25,000 euros per person are possible.
Project company
The owner of the wind turbines is Ostenfeld Bürgerwind GmbH, based in Osnabrück, Lower Saxony. The company is entered in the commercial register of the Osnabrück local court (Amtsgericht) under register number HRB 219850. It is represented by its managing director with sole power of representation, Johannes Busmann, who has been active in the field of renewable energy with Prowind GmbH since 2000 and can draw on a great deal of experience.
In addition, Prowind GmbH also acts as operations manager for its own plants and will take over the commercial operational management for the Ostenfeld wind farm. Prowind GmbH, which has realised numerous wind farms from project development through construction to operational management, will also be responsible for the technical operational management.
| Term | Interest | Repayment | Interest date | Maturity |
|---|---|---|---|---|
| 10 years | 5.50 % p. a. | Instalment loan | 31.12. annually (first on 31.12.2027) | 31.12.2034 |
| Type of loan | Instalment loan |
|---|---|
| Interest payment frequency | annually |
| Available from | 24.02.2025 |
Downloads
Your personal payment plan (5.50 % interest p. a.)
| Year | Date | Payment (gross) | Interest | Repayment | Status |
|---|
Example calculation based on the terms, without accrued interest or a different first interest period; amounts rounded. Only the loan agreement and the investment information sheet (Vermögensanlagen-Informationsblatt) are authoritative. Taxes are not taken into account.