- Experienced project developer
- Growing future market for renewable energy
- Existing asset with earnings history
Welcome note
.jpg)
**Dear investors,
we are delighted to present our Rätzlingen I solar power plant to you. Together with its sister plants Rätzlingen II and Rätzlingen III, the plant is located on the edge of the Drömling biosphere reserve, in the Rätzlingen district of the town of Oebisfelde-Weferlingen in Saxony-Anhalt.
Having already successfully financed our Pähl solar power plant through DKB-Crowd with your help, we would like to give you the opportunity to also benefit from the solar income of the Rätzlingen I solar power plant. We would like to take this opportunity to thank all the investors who contributed to the success of the crowdfunding for the Pähl solar power plant.
Since 2004, we at Wattner have focused on solar energy in Germany, and with our experience we have been launching safe and profitable investments (Vermögensanlagen) since 2008. Using the sun to generate electricity is absolutely pioneering. It is ecological and sustainable, uses the strongest natural resource known, and offers investors a good return even in today's low-interest environment.
Wattner is the only engineer-led issuing house that specialises in the planning, construction and operational management of energy plants, and it is represented on the German financial market with the most German megawatt-scale solar power plants. As an owner-managed company, we are committed solely to our investors, which gives us wide freedom to take decisions in their interest.
With our expertise and technical understanding as engineers, our commercial competence and the contacts in the industry that we have nurtured over many years, we have invested more than 593 million euros in solar power plants. We built the majority of these plants ourselves, and we therefore know from our own experience every detail relevant to successful project planning and implementation. More than 8,000 investors have chosen Wattner to date. With their help, since 2008 we have invested a record sum of 482 million euros in 81 solar power plants with a capacity of around 334 megawatts.**
Yours, Dipl.-Ing. Ulrich Uhlenhut
Management Board of Wattner AG
Project description
The project company
The owner of the solar plant and the borrower is the project company Wattner SunAsset Solarkraftwerk 017 GmbH & Co. KG, with its registered office in Cologne. It has been registered since 2010 with the Cologne Local Court (Amtsgericht Köln) under HRA 28052. It is represented by its general partner, Wattner Energie und Management Verwaltungs GmbH, which in turn is represented by its two managing directors with sole power of representation, Ulrich Uhlenhut and Guido Ingwer.
The project
In Rätzlingen, Wattner built a ground-mounted solar power plant with a rated capacity of 5,613 kWp in 2011 and has operated it successfully ever since. It is equipped with around 24,000 polycrystalline modules from ET Solar and three central inverters from Siemens. The surface area of the modules is roughly 39,000 m², which corresponds to about 5½ football pitches.

(The Rätzlingen I solar power plant to be financed here can be seen in the background of the picture; the sister plants Rätzlingen II and Rätzlingen III are in the foreground.)
The plant benefits from the provisions of the German Renewable Energy Sources Act (EEG) and receives a statutory guaranteed remuneration of 21.11 cents/kWh until the end of 2031. Under the EEG, the energy generated has priority feed-in to the power grid of Avacon Netz GmbH. The electricity generated is sold directly to the market by NEXT Kraftwerke GmbH, based in Cologne. Average annual energy production is around 5.6 million kWh – in the sunny year 2018 it was even over 6.3 million kWh, which in theory could supply electricity to more than 4,200 electric cars. The average annual energy production corresponds to an average specific yield of around 1,013 kWh/kWp.
Long-term lease agreements exist for the land on which the solar power plant was built. The plant is maintained by our own operational management company, which looks after all Wattner solar power plants. There is electronics insurance and electronics business interruption insurance with AXA, which cover the main risks. There is also liability insurance with Gothaer. The grounds are kept in check by an organic shepherdess – or more precisely, by her four-legged helpers: Heidschnucken, Moorschnucken and East Prussian Skudden. The latter, incidentally, are among the oldest breeds of domestic sheep and are on the Red List of endangered livestock breeds.
Since 2012, the solar plant has been financed, among other things, with funds from Deutsche Kreditbank Aktiengesellschaft. As at 31 December 2019, the loans still amounted to EUR 7.5 million and are scheduled to be fully repaid by 31 March 2030. In connection with the financing, collateral was provided to Deutsche Kreditbank Aktiengesellschaft to the usual extent. In particular, the solar plant was assigned as security (Sicherungsübereignung) and the feed-in revenues were assigned. The contractually agreed payments to Deutsche Kreditbank Aktiengesellschaft always take priority over payments to the crowd investors.
The project company is offering crowd investors three different subordinated loans up to a total amount of EUR 2.15 million. At the express request of many crowd investors, shorter loan terms are now also possible. You can choose between the following variants:

After deduction of the funding costs of EUR 107,500, the funds of EUR 2,042,500 are to go to the shareholder of the project company, which will use them to realise further projects in the field of renewable energy and thus drive forward the energy transition.
The crowd investors are investing in a solar plant that has already been built and has been producing reliably for many years, with a statutory guaranteed remuneration. The longest-term crowd investment has a term that is 1.5 years shorter than the remaining EEG remuneration period. The Solar “L” variant is to be fully repaid by 30 June 2030; the EEG remuneration period ends on 31 December 2031. This provides a certain safety buffer should bottlenecks arise during the term of the loans, contrary to expectations. In this way, interest and repayments to investors are well secured even in an emergency. The loan from Deutsche Kreditbank Aktiengesellschaft is scheduled to be fully repaid by 31 March 2030, and after that the solar income, after deduction of the operating costs of the solar power plant, is available for the safety buffer. Overall, we assume the following liquidity plan for the project company for the years 2020 to 2031:

For energy production, we have used the average value for the years 2013 to 2019 and reduced it by 0.2% per year to allow for possible performance losses of the solar modules. Energy production multiplied by the statutory guaranteed feed-in tariff and the additional revenue from voluntary direct marketing gives the annual receipts of the project company.
The costs of operating the plant include costs for maintenance and operational management, grounds upkeep (the four-legged helpers do not “work” for free), land lease payments, insurance and purchased electricity. We have also assumed an amount of 2.6 EUR/kWp per year for repairs and maintenance. All of these values are based on contractual agreements or past experience. An inflation adjustment of around 1% per year has also been taken into account. Administrative costs include the costs of annual financial statements, tax returns and other costs. They also include trade tax, which unfortunately rises over the years. In the line “Cash surplus before crowdfunding” you can see how much money should still be “left over” in a year after all costs have been paid and interest and repayments have also been made to Deutsche Kreditbank Aktiengesellschaft. On this basis, we have set the maximum loan amount and the repayment structure for the crowdfunding – always in such a way that a liquidity buffer remains afterwards.
All the values shown are, by their nature, forecasts, which we have set to the best of our knowledge and belief. We have taken a rather conservative approach, with the aim that payments to you, dear crowd investors, are secured even if, for example, the sun shines less in a given year or, contrary to expectations, higher repair costs arise. Despite all the care taken in compiling the figures, we cannot rule out that things turn out worse than expected and that payments to you cannot be made, or cannot be made in full.
| Term | Interest | Repayment | Interest date | Maturity |
|---|---|---|---|---|
| 5 years | 3.00 % p. a. | Instalment loan | 31.12. annually (first on 31.12.2020) | 30.06.2030 |
| Type of loan | Instalment loan |
|---|---|
| Interest payment frequency | annually |
| Available from | 13.03.2020 |
Downloads
- Vermögensinformationsblatt (VIB, investment information sheet) Rätzlingen S
- Vermögensinformationsblatt (VIB, investment information sheet) Rätzlingen M
- Vermögensinformationsblatt (VIB, investment information sheet) Rätzlingen L
- Annual financial statements of Wattner SunAsset Solarkraftwerk 017 GmbH & Co. KG as at 31.12.2019
- Commercial register extract of Wattner SunAsset Solarkraftwerk 017 GmbH & Co. KG
Your personal payment plan (3.00 % interest p. a.)
| Year | Date | Payment (gross) | Interest | Repayment | Status |
|---|
Example calculation based on the terms, without accrued interest or a different first interest period; amounts rounded. Only the loan agreement and the investment information sheet (Vermögensanlagen-Informationsblatt) are authoritative. Taxes are not taken into account.