- Community participation
- Local stakeholders
- Already under construction
Pre-subscription phase
The offer applies for a period of 4 weeks exclusively to citizens who are considered affected within the meaning of the NWindPVBetG. Residents are affected if they are registered, with a main or secondary residence within the meaning of § 20 of the Federal Registration Act (Bundesmeldegesetz) of 3 May 2013 (BGBl. I p. 1084; 2014 I p. 1738), last amended by Article 3 para. 3 of the Act of 22 March 2024 (BGBl. 2024 I No. 104), in the area of the affected municipality […] and the residence […] is located no more than 2,500 metres from the outer edge of the open-space project.
Here, this means that all residents of the municipality of Marxen who live no more than 2.5 km from the plant are eligible.
Afterwards, the remaining volume will be offered for a further 4 weeks to all residents of the Samtgemeinde Hanstedt.
Welcome note

Dear residents of Marxen,
I have been working on the implementation of a solar park in our neighbourhood since 2018. From the start, the aim was for this to be a project that does not fall into the hands of distant large-scale investors, but is financed and operated locally. Now the time has come: construction of the solar park has been under way since 1 September. Our partner SPM will build a high-quality solar park with a total capacity of 5.5 MWp in a short time on the site by the railway line behind the industrial estate.
This is the ideal moment to take part by means of a subordinated loan. Make use of the opportunity and secure an attractive rate of interest.
Kind regards,
Bastian Schultz
Managing Director of Solarpark Marxen GmbH & Co. KG
Opportunities and risks
| Opportunities | Risks |
|---|---|
|
|
Along the railway line in the area behind the industrial estate "Hinter der Bahn" in Marxen, we are building a solar park with a capacity of 5.5 MWp on an area of 3.5 ha. In the longer term, an additional 5 MWh battery storage system is also planned. We are using high-quality technology: modules from DMEGC and inverters from Huawei. The energy is fed in directly on site via a medium-voltage cable. Extensive planting around the solar park ensures that it blends well into the landscape.
After commissioning, the plant is expected to generate around 5,300 MWh of electricity per year and feed it into the public grid. Construction will begin on 31.08.26, the modules will arrive in November, and the park is expected to be completed by the end of the year. The grid connection will then follow in early 2027.

Use of funds
The funds will be used to build the plant.
Source of funds – financing structure
The project is financed largely through a debt loan from DKB AG. The equity contributed comes from the two limited partners, Bastian Schultz and Jan Peter Kahnenbley, in equal halves. The DKB-Crowd loans form a third financing component and secure the project's local roots in the municipality.
Project company
The project is being carried out by Solarpark Marxen GmbH & Co KG, an operating company established specifically for this project. Its partners are Bastian Schultz from Asendorf, as developer and project planner of the park, and Jan Peter Kahnenbley from Beckedorf, as a committed farmer. In early 2025, after many years as managing director of a large solar company, Bastian Schultz founded BSA PV GmbH, and since then he has been developing and carrying out projects in the Nordheide region from Seevetal to Bispingen.
The project pipeline comprises around 80 MWp.
Organisation chart

Citizens have the opportunity to participate in the solar park via DKB Crowd by means of a qualified subordinated loan totalling 110,000 euros.
The interest rate is 5.50% per year over a term of 7 years. No closing fees are charged to investors. The investment amount is limited to 5,000 euros per person. Investments are possible from 250 euros up to 5,000 euros in steps of 50 euros.
Interest is paid annually. The invested capital is repaid in equal instalments.
| Term | Interest | Repayment | Interest date | Maturity |
|---|---|---|---|---|
| 7 years | 5.50 % p. a. | in equal instalments | 31.12. annually (first on 31.12.2027) | 31.12.2033 |
| Type of loan | in equal instalments |
|---|---|
| Interest payment frequency | annually |
| Available from | 19.10.2026 |
| Minimum investment | EUR 250 |
| Maximum investment | EUR 5,000 |
Downloads
Your personal payment plan (5.50 % interest p. a.)
| Year | Date | Payment (gross) | Interest | Repayment | Status |
|---|
Example calculation based on the terms, without accrued interest or a different first interest period; amounts rounded. Only the loan agreement and the investment information sheet (Vermögensanlagen-Informationsblatt) are authoritative. Taxes are not taken into account.