Dear investors,
I am pleased that you are interested in our current projects. Solarpark MSP5 GmbH & Co. KG has built this solar park in the municipality of Triefenstein in the Main-Spessart district.
We have experience:
As early as 1991, together with his family, I built one of the first photovoltaic systems in Bavaria in Bessenbach-Keilberg. This was at a time when the energy transition was still a thing of the future and there was no legal basis for a project of this kind.
From this first contact with solar power, the region's largest photovoltaic company developed over the years: Main-Spessart-Solar, founded in 2005, which is vigorously driving the switch to 100% renewable energy here in our region.
We build solar power systems of every size, from single-family homes to industrial companies.
Since 2009 we have also been building power-plant-scale systems throughout Lower Franconia. Large ground-mounted systems, with the participation of municipalities and citizens, are planned, built and managed by our own technicians and engineers.
Let the current project in Triefenstein be your opportunity to take an active part in the energy transition in your region.
Yours, Bernd Büttner
Managing Director, Main-Spessart-Solar
Contribution to the UN Sustainable Development Goals
Our region and our environment are close to our hearts, which is why our solar parks make a valuable contribution to preserving the environment and the region. We plan all solar park projects so that everyone involved benefits. A solar park from Main-Spessart-Solar is an investment in the green future of your region.
Opportunities and risks
| Opportunities | Risks |
|---|---|
|
|
After the municipality of Triefenstein and the district office in Karlstadt had approved the project, construction of the ground-mounted photovoltaic system in the districts of Trennfeld and Rettersheim was able to begin in autumn 2022. On several areas sloping gently towards the south-west or south-east for the most part, along the A3 motorway from Würzburg towards Frankfurt, over 51,000 monocrystalline solar modules were installed facing both directions of travel. The output of the entire system is 21,994 kWp. This system can supply 6,000 single-family homes with green energy. Long-term lease agreements were concluded with the landowners concerned. On 15.06.2023 the system was successfully connected to the power grid and put into operation. The solar energy generated on site is fed into the Bayerwerk grid under the Renewable Energy Sources Act (EEG) and sold directly via Stadtwerke Würzburg (WVV). Average annual energy production is around 22 million kWh, which corresponds to a specific yield of around 1,000 kWh/kWp. Even in the planning phase, ecological use of the areas between the solar modules was taken into account and a high-quality meadow was sown, so that, alongside power generation, biodiversity is also actively supported. In future, sheep will take over maintenance work in the solar park, and spaces for beehives are also planned. Our own maintenance and service company is responsible for operations management and, thanks to the short distances, can act extremely reliably. The project was largely financed through the local banks, Sparkasse Aschaffenburg-Alzenau & Sparkasse Mainfranken; community participation is now to be realised through crowdfunding, with residents of the neighbouring municipality being given preference.
Use of funds
The citizens' capital raised serves as equity. Investments between 250 EUR and 5,000 EUR are possible.
Source of funds – financing structure
The cost of the park amounts to around 12.4 million EUR. 9.6 million EUR was financed through the Sparkassen, and 750,000 EUR is to be raised from citizens via DKB-Crowd to provide further financing for the park.
Project company
The owner of the photovoltaic system and the borrower is the limited partnership Solarpark MSP5 GmbH & Co. KG, with its registered office in 63856 Bessenbach. It was established under German law and entered in the commercial register (Handelsregister) at the competent local court (Amtsgericht) in Aschaffenburg on 15.11.2022 under HRA 5182. The general partner with personal liability is Main-Spessart-Solar Invest, whose managing director is also Bernd Büttner. As managing director of the general partner, Mr Bernd Büttner can draw on more than 25 years of experience in the construction and operation of photovoltaic systems. He, or Main-Spessart-Solar GmbH, which he also leads as managing director, has so far installed over 3,400 systems with a total output of 136,000 kWp in the region. In the last eleven years, 24 ground-mounted solar systems have been built, and residents of the individual Lower Franconian municipalities have been offered the opportunity to participate.
Solarpark MSP5 GmbH & Co. KG offers investors a subordinated loan up to a total amount of 750,000 EUR. The funds flow to the company to cover the remaining project financing and thus to offer you community participation.
As crowd investors, you are investing in the photovoltaic system, which has been in operation since June 2023 and which receives a statutory feed-in tariff of between 6.39 cents and 6.69 cents per kWh under the Renewable Energy Sources Act (EEG).
Interest is 4.0% per year, with a term of 10 years.
Or:
In order to grant the issuer a subordinated loan at an interest rate of 5.0% instead of 4.0%, the investor must use solar power from the Triefenstein solar park. To do so, a regional electricity supply contract with Stadtwerke Würzburg (WVV) must be concluded before a subscription via DKB Crowd is completed. Further information on how you can use solar power from Triefenstein can be found at: www.wvv.de/triefenstein.
Interest is payable annually in arrears on 31.12., for the first time on 31.12.2024 and for the last time on 31.12.2033. Repayment is made annually in equal instalments on 31.12., for the first time on 31.12.2024. The repayment instalments up to 31.12.2033 amount to 10% of the subscribed subordinated loan amount per year.
| Term | Interest | Repayment | Interest date | Maturity |
|---|---|---|---|---|
| 10 years | 5.00 % p. a. | Instalment loan | 31.12. annually (first on 31.12.2024) | 31.12.2033 |
| Type of loan | Instalment loan |
|---|---|
| Interest payment frequency | annually |
| Available from | 18.04.2024 |
| Minimum investment | EUR 250 |
| Maximum investment | EUR 5,000 |
Downloads
Your personal payment plan (5.00 % interest p. a.)
| Year | Date | Payment (gross) | Interest | Repayment | Status |
|---|
Example calculation based on the terms, without accrued interest or a different first interest period; amounts rounded. Only the loan agreement and the investment information sheet (Vermögensanlagen-Informationsblatt) are authoritative. Taxes are not taken into account.