





- Innovative energy cluster and sector coupling
- Reduced risk thanks to grid connection commitment
- Regional benefit for local residents
Pre-subscription phase
Citizens of Beuchte, Isingerode, Schladen and Wehre receive four weeks of early access before the campaign is opened to everyone.
Welcome note

Dear investors,
Welcome to our forward-looking energy project in Schladen-Werla. As managing director of SESP Photovoltaik Schladen GmbH & Co. KG, I am delighted by your interest in making an active and economically attractive contribution to the regional energy transition together with us.
What is our project about?
The subject of our project is the successful operation of a modern ground-mounted photovoltaic plant with a substantial total capacity of 20,000 kWp in Schladen, Lower Saxony. The solar park has already been built using high-quality components – including 31,879 solar modules from Astronergy and 55 inverters from GoodWe. The grid connection commitment is binding and in place. The aim now is to produce electricity from photovoltaics and make it directly usable where the future of digital infrastructure is being shaped.
What do we plan to do with the capital raised?
The total cost of the project amounts to 10,010,000 EUR, most of which is covered by first-ranking bank loans and equity. Through DKB crowdfunding, we are now raising 485,000 EUR in net proceeds. This crowdfunding goes directly towards the final financing of the construction costs and the long-term operation of the plant by SESP. For you as an investor, this means a transparent investment: the revenue from electricity sales is scheduled to be used to service your annual interest of 5.50% p.a. and the repayment in equal instalments (10% per year) until the end of the term on 31.12.2036.
What sets our project apart?
Our project stands out from conventional solar parks thanks to a groundbreaking regional overall concept. Through its direct proximity to the planned 200 MW data centre in Beuchte and the neighbouring community wind farm, we are creating a direct bridge between electricity from photovoltaics and digital consumption.
The technical construction of the park is the foundation, but the acceptance and genuine participation of the local people is the real success of the project. Cooperation with the municipal administration here in Schladen-Werla and with local partners has been exemplary from the start. As the future operator, we now want to ensure that we continue on the path of maximum transparency and enable citizens to take an active part in the regional energy transition.
This transparent participation is of central importance, particularly with regard to another infrastructure project of pioneering significance for the region in the immediate vicinity: the planned 200 MW data centre in Beuchte.
By supplying the data centre directly with solar power from the neighbouring Bürgerwindpark Beuchte community wind farm and our new ground-mounted photovoltaic plant, an energy cluster is being created in the municipality of Schladen-Werla that has no equal. In this way, we manage to synchronise local generation and consumption of solar power perfectly. In future, the wind and PV plants are to be connected to the data centre via direct lines. This means the energy-intensive operation of the data centre can be supplied with electricity from renewable energy.
To underline this local anchoring, we are also granting citizens in the immediate vicinity (within a radius of 2.5 kilometres) an exclusive four-week pre-subscription phase.
What experience do we bring & how long have we been active in the market?
SESP (SESP II Solar Projects), based in Schladen, is a specialised German project developer whose dedicated team has been bringing photovoltaic projects to success since 1998. We offer comprehensive services from project planning and construction through to reliable operation.
We are supported in this project by the experienced EBERT Erneuerbare Energien Unternehmensgruppe (EBERT renewable energy group of companies), which is available to us as a project developer. EBERT is an owner-managed pioneering company with a team of experienced specialists, also active in the market since 1998, which has already successfully realised more than 130 wind turbines as well as numerous solar and biogas plants. Through this close partnership between SESP as operator and EBERT as project developer, you benefit from decades of expertise and the highest level of professionalism.
Become part of this unique energy cluster and benefit financially from a future-proof, local investment!
With warm regards,
Michael von Loh
Managing Director of SESP Photovoltaik Schladen GmbH & Co. KG
Opportunities and risks
| Opportunities | Risks |
|---|---|
|
|
Ground-mounted photovoltaic plant Schladen
The project combines established generation technology with a forward-looking regional sector coupling concept in order to link the local generation of electricity from photovoltaics directly with the region's digital infrastructure.
As an entrepreneurial investment in the form of an unsecured subordinated loan with qualified subordination and a pre-insolvency enforcement bar, the economic viability of this financial product is based directly on the factual project data set out below and the electricity revenues generated.
The core areas of the project
1. What is the project about and what will be realised with the capital?
The subject of the project is the financing of the construction costs and the operation of a ground-mounted photovoltaic plant in Schladen, Lower Saxony. The total cost of the project amounts to 10,010,000 EUR. The overall financing rests on a solid foundation of first-ranking bank loans of 9,010,000 EUR and 1,000,000 EUR of equity employed.
The net proceeds of 485,000 EUR targeted through this crowdfunding will be used for the designated purpose, together with the bank loans and the equity, to fully realise the financing of the construction costs and the operation of the plant.
The generation and sale of electricity produces revenue from which the scheduled annual interest of 5.50% p.a. (calculated from the individual day of payment into the trust account) and the annual repayments to investors are made. The repayment instalments amount to 10% per year of the subscribed subordinated loan amount and are made for the first time on 31.12.2027, up to the uniform end of the term on 31.12.2036.
2. What is special about the project?
The project stands out through its direct integration into a planned, pioneering regional energy cluster:
Direct supply to the data centre: In the immediate vicinity is the forward-looking infrastructure project of a planned 200 MW data centre in Beuchte. Our ground-mounted photovoltaic plant is to be connected to the data centre via direct lines in future. This means the energy-intensive operation of the data centre can be supplied with unbeatably low-cost solar power – a genuine and lasting competitive advantage for the location.
Synchronisation with the Bürgerwindpark Beuchte community wind farm: Together with the neighbouring community wind farm, a perfectly coordinated generation structure is being created that synchronises the local generation and consumption of solar power.
Exclusive local community participation: To strengthen local acceptance and genuine participation of the local people, the issuer grants citizens who live within a radius of 2.5 kilometres of the ground-mounted photovoltaic plant an exclusive pre-subscription phase of 4 weeks after the first publication.
3. Where is the project located?
The ground-mounted plant is located in D-38315 Schladen, Lower Saxony, within the municipality of Schladen-Werla. The leased areas are specifically located in the cadastral district of Schladen, Flur 18, on plots 43 and 47. The issuer, SESP Photovoltaik Schladen GmbH & Co. KG, also has its registered office directly at Oststraße 7 in 38315 Schladen.
4. How far has implementation progressed (milestones) and what is the timetable?
The project has a clearly defined risk profile, as the technical construction of the park has already been completed. The following key milestones have been fully achieved:
Plant fully built: The ground-mounted plant has already been physically set up with 31,879 solar modules from the manufacturer Astronergy Europe GmbH (types CHSM66RN(DG)/F-BH 625 and CHSM66RN(DG)/F-BH 630) and 55 inverters from GoodWe Europe GmbH (type GW350KH-UT). The ground-mounted photovoltaic plant has a capacity of 20,000 kWp.
Contractual infrastructure: All contracts required for construction and installation, usage agreements for the long-term use of the land, and a commercial and technical operations management agreement have already been legally concluded.
Grid connection secured: The grid connection requirements and the grid connection commitment are already binding and in place.
Timetable and process:
While the crowdinvesting campaign is still running, the plant will move into permanent, scheduled feed-in operation following final grid integration. The term of the investment (Vermögensanlage) begins individually upon conclusion of the contract and ends uniformly on 31.12.2036 (with a flexible repayment window of six months before and after the cut-off date). The right of ordinary termination is excluded for both parties.
5. What motivates the project initiators?
Behind the project is the well-established team of SESP (SESP II Solar Projects) as the future operator and a specialised German project developer based in Schladen, whose team has been bringing photovoltaic projects to success nationally and internationally since 1998. The project is supported by the experienced EBERT Erneuerbare Energien Unternehmensgruppe as a partner in project development (planning and construction). EBERT is an owner-managed pioneering company with a team of experienced specialists, also active in the market since 1998, which has already realised more than 130 wind turbines as well as numerous solar and biogas plants.
The initiators' central motivation is: “The technical construction of the park is the foundation, but the acceptance and genuine participation of the local people is the real success of the project,” explains Clemens von König, managing director of SESP Photovoltaik Schladen GmbH & Co. KG. Cooperation with the municipal administration in Schladen-Werla and with local partners has been exemplary from the start. As the future operator, the initiators want to ensure they continue on the path of maximum transparency and enable citizens to take an active, financial part in the regional energy transition.
Use of proceeds
The crowdinvesting capital raised via DKB Crowdfunding GmbH is used to realise renewable energy projects.
According to the official Vermögensanlagen-Informationsblatt (VIB, investment information sheet), the specific use of proceeds is as follows:
Financing of construction costs and operation: The net proceeds from the crowdfunding of 485,000 EUR go directly towards the overall financing of the construction costs and the subsequent commercial operation of the ground-mounted photovoltaic plant in Schladen.
Equity refinancing: The crowdinvesting capital serves as the final building block of the total cost budget, which amounts to 10,010,000 EUR in total. It supplements the senior bank loan (9,010,000 EUR) and contributes to the refinancing of the equity contributed by the shareholders (1,000,000 EUR).
Revenue generation for debt service: The use of the capital secures the reliable electricity generation of the already built 20,000 kWp plant (consisting of 31,879 solar modules from Astronergy and 55 inverters from GoodWe). The revenue generated from electricity sales is scheduled to be used to pay the annual interest (5.50% p.a.) and the repayment in equal instalments to investors.
Source of funds - financing structure
The financing structure consists of three main building blocks, in which conventional bank and equity funds are supplemented by crowdfunding:
Financing component / partner | Amount (in EUR) | Share | Details on security & ranking |
First-ranking bank loans | 9,010,000 EUR | ~ 90.0% | Secured with first ranking: These loans are provided by banks. They must be serviced irrespective of the issuer's income situation and are generally secured by conventional bank collateral such as land charges on the project sites as well as assignments by way of security of the feed-in revenue and plant components. |
Equity employed (EK) | 1,000,000 EUR | ~ 10% | Subordinated liable capital: Contributed directly by the shareholders of the project company. It serves as a liability base for senior creditors and bears the primary entrepreneurial risk. It is completely unsecured. |
Other mezzanine capital | 0 EUR | 0.0% | According to the Vermögensanlagen-Informationsblatt, no further mezzanine or bridge financing components are planned for the project. |
Total investment | 10,010,000 EUR | 100.0% |
DKB crowdfunding (Schwarmfinanzierung) | 485,000 EUR | ~ 4.8% | Unsecured subordinated loan: Raised via the platform as net proceeds. It carries a qualified subordination and a pre-insolvency enforcement bar. It is entirely unsecured; there are no land charges or other guarantees. |
Project company

SESP Photovoltaik Schladen GmbH & Co. KG acts as issuer and project company in this project. The structure behind the company brings together experienced players and pioneers of renewable energy in a transparent, collaborative network.
The structural and corporate areas
1. Purpose and objective of the project company
SESP Photovoltaik Schladen GmbH & Co. KG is a pure project company. Its sole business purpose is the construction and operation of the photovoltaic plant in Schladen and the associated infrastructure. This also includes the sale of the electricity generated together with all related activities. As a project company, it conducts no other business, which ensures that the crowdinvesting funds raised are used for the designated purpose of the large-scale solar project.
2. Who is behind the project? (Shareholder and group structure)
Behind the issuer is a clearly defined ownership structure of strategic partners and industry experts:
The issuer: SESP Photovoltaik Schladen GmbH & Co. KG.
General partner (with unlimited liability): SESP Haftungsgesellschaft mbH (represented by the managing directors Dr. Tim Ebert, Clemens von König and Michael von Loh).
Limited partners:
§ SESP II Solar Projects GmbH & Co. KG (liability amount: €583,500).
§ CvK Beteiligungs GmbH & Co. KG (liability amount: €437,500).
§ Breustedt, Olaf (liability amount: €24,000).
The structure of the principal limited partner (SESP II Solar Projects GmbH & Co. KG): This company is in turn managed by SESP Haftungsgesellschaft mbH as general partner and is divided among four main limited partners:
Ebert Erneuerbare Energien Beteiligungs-GmbH & Co. KG (liability amount: €10,000). Behind it are Ebert Erneuerbare Energien Haftungsgesellschaft mbH (managing director: Dr. Tim Ebert), I.P.T. Ebert Beteiligungsgesellschaft mbH (liability amount: €5,000) and Dr. Tim Ebert personally (liability amount: €5,000).
CvK Beteiligungs GmbH & Co. KG (liability amount: €10,000). Behind it are CvK Verwaltungsgesellschaft mbH and Clemens von König as limited partner (liability amount: €10,000; managing director: Clemens von König).
Michael von Loh (liability amount: €7,000).
Valentin von Loh (liability amount: €3,000).
Through this division, the expertise of the EBERT Erneuerbare Energien Unternehmensgruppe is combined directly with the local and operational management expertise of SESP II Solar Projects under the leadership of Clemens von König.
3. Since when have the company and the group existed?
Both the core team of SESP II Solar Projects and the owner-managed EBERT Erneuerbare Energien Unternehmensgruppe (with locations in Kiel and Cremlingen) have been active in the market since 1998 as reliable partners for sustainable energy projects in Germany. They are therefore among the true pioneers of the German energy transition.
4. What successes and references can be shown?
The project partners look back on a long-standing, demonstrable track record in the realisation of large-scale renewable energy projects:
More than 130 wind turbines have already been successfully planned, built and handed over to long-term operations management by the EBERT group.
Numerous solar and biogas plants have been brought to success by the dedicated team.
With an experienced team of specialists, the group covers the entire value chain from the initial project idea through turnkey construction to commercial and technical operations management.
5. Corporate philosophy
The initiators' philosophy is based on three central pillars: regional value creation, a high degree of transparency and local participation.
The initiators do not see themselves as pure financial investors, but as long-term partners for municipalities, landowners and the local population. The overarching aim of the project in Schladen is to prove, through the emerging energy cluster (coupling with the community wind farm and the planned Beuchte data centre), that decentralised renewable energy generation and modern digital infrastructure can be perfectly synchronised in rural areas. The financial involvement of citizens through crowdinvesting is an essential building block for the social acceptance of the project.
The key economic and legal data of the financial product offered are based on the official information in the Vermögensanlagen-Informationsblatt (VIB, investment information sheet):
Total amount (funding limit): The maximum issue volume of the crowdfunding amounts to 485,000 EUR net proceeds (the maximum total volume of the subordinated loans under the framework is 500,000 EUR). An individual contract must be for at least 250 EUR and divisible by 50.
Type and rate of interest: The interest rate is 5.50% p.a. (act/365). Interest is calculated individually from the day the money is received in the trust account (payment date). Payment is made annually in arrears on 31.12., for the first time on 31.12.2027.
Type of repayment: Repayment is made annually in equal instalments. The repayment instalments amount to 10% per year of the respective subscribed subordinated loan amount. The first repayment instalment falls due on 31.12.2027.
Term and repayment date: The term begins individually upon conclusion of the contract and ends uniformly on 31.12.2036 (repayment date).
Special features (subordination and time limits):
Qualified subordination: This is an unsecured subordinated loan with a pre-insolvency enforcement bar. Claims to interest and repayment are blocked if payment would trigger insolvency of the issuer or if a ground for insolvency already exists.
Repayment window: The issuer has the right to make repayment flexibly within a window of six months before or after the repayment date (earliest 30.06.2036, latest 30.06.2037).
Exclusion of termination: The right of ordinary termination is excluded for both parties throughout the entire term.

| Term | Interest | Repayment | Interest date | Maturity |
|---|---|---|---|---|
| 10 years | 5.50 % p. a. | in equal instalments | 31.12. annually (first on 31.12.2027) | 31.12.2036 |
| Type of loan | in equal instalments |
|---|---|
| Interest payment frequency | annually |
| Available from | 06.10.2026 |
Downloads
Your personal payment plan (5.50 % interest p. a.)
| Year | Date | Payment (gross) | Interest | Repayment | Status |
|---|
Example calculation based on the terms, without accrued interest or a different first interest period; amounts rounded. Only the loan agreement and the investment information sheet (Vermögensanlagen-Informationsblatt) are authoritative. Taxes are not taken into account.