



- Opportunity to participate in the energy transition
- Municipal systems on regional sites
- 4 rooftop PV systems on municipal facilities
Regional pre-subscription phase
Until 30.11.2024, only citizens of the district of Barnim can invest in the “Sonnendächer im Barnim” project. From 01.12.2024, the project will also be opened up to investors from outside the region.
Welcome note

Dear residents of Barnim,
dear supporters of the energy transition,
We are delighted by your interest in our project “Sonnendächer im Barnim” (Solar Roofs in Barnim)! The four solar rooftop systems presented here, which will be built on municipal buildings, are located in the Barnim towns of Ahrensfelde, Bernau, Schorfheide and Eberswalde.
The companies of Kreiswerke Barnim GmbH are drivers of the energy and mobility transition and of the circular economy. Building and operating photovoltaic systems (rooftop and ground-mounted systems) is one of our focus areas. These tasks are carried out by our subsidiaries Barnimer Energiebeteiligungsgesellschaft mbH and SUN:BAR Photovoltaik Barnim GmbH.
As a company owned by the district, we work closely with the municipalities and their residents in our district, and we want to advance the energy transition together with local partners. The idea of a circular economy and involving local people is particularly important to us.
To increase acceptance of renewable energy projects, we would like to offer you an attractive opportunity from which you can both benefit personally and support the energy transition in the district of Barnim. Through your investment, you help secure value creation and jobs in our district. To begin with, all residents of Barnim have exclusive access rights!
We look forward to moving forward together with you!
Christian Mehnert
Managing Director
Contribution to the UN Sustainable Development Goals
Extensive expertise in the planning, construction and operation of the systems
Production of electricity from solar power
Feed-in to the grid and the option of self-consumption
Securing and creating good jobs in the region
Investment in future-proof technologies
Expansion of energy infrastructure
Cooperation with partners from the region – closing local loops
Regional expansion of photovoltaics
Use of regionally generated energy on site
Saving CO2 emissions by producing electricity from renewable sources
Construction of rooftop systems and supply of the district of Barnim with renewable electricity
Opportunities and risks
| Opportunities | Risks |
|---|---|
|
|
Since 2016, Kreiswerke Barnim has been a driver and accelerator of the energy transition as a regional player. With numerous projects, we are active in mobility (the hydrogen-powered Heidekrautbahn rail line, hydrogen-powered waste collection vehicles, electric-vehicle-based car sharing and charging infrastructure), in heating, in the planning and construction of wind turbines, and above all in the construction and operation of photovoltaic systems, both ground-mounted and on rooftops.
In 2023, we once again significantly increased the speed at which we implement electricity generation projects based on renewable energy, in order to further advance regional self-sufficiency. We would like to win you over as a regional partner so that we can advance renewable energy projects with a regional focus and regional value creation together.
The four projects on offer are photovoltaic systems on the roofs of municipal facilities (Municipality of Ahrensfelde – Eiche volunteer fire brigade 67.32 kWp, City of Bernau bei Berlin – Friedensthal multi-storey car park 316.8 kWp, Bildungseinrichtung Buckow e.V. – Buckow kitchen 83.16 kWp, Kommunal- und Infrastrukturservice GmbH – roofs of the operating site 160.16 kWp) with a total capacity of 627.44 kWp. These sites were made available to us by the municipalities and by municipal and social partners. They benefit from attractive lease income and, in some cases, from inexpensively generated electricity for their own consumption.
The municipalities’ aim is to support sustainable development in the district of Barnim and to contribute to regional value creation. Photovoltaic systems on rooftops do not give rise to the land-use conflicts associated with conventional ground-mounted systems, since, for example, no farmland is taken up.
The electricity generated on site is fed into the distribution grid of e.dis Netz GmbH or used directly on site by the respective partners. Remuneration is provided under the Renewable Energy Sources Act (EEG) and in connection with direct marketing, as well as through electricity supply contracts with the local partners.
Some of the four systems presented have already been completed, while the others will be connected to the grid by the end of 2024.
Use of funds
The citizen capital raised serves the project as economic equity for the construction of the PV systems. Investments are possible between 250 and 25,000 euros per person, in steps of 50 euros.
Source of funds – financing structure
The costs of the four rooftop systems amount to 625 thousand EUR. No external funds were used for these systems. Citizens have the opportunity to participate via DKB Crowd by means of a qualified subordinated loan totalling 625,000 euros, thereby replacing the equity used so far.

Project company
Kreiswerke Barnim GmbH and its subsidiaries are engaged in the construction and operation of photovoltaic systems.
The issuer of the “Sonnendächer im Barnim” offer is Barnimer Dienstleistungsgesellschaft mbH (BDG). The systems are built and operated by the affiliated companies Barnimer Energiebeteiligungsgesellschaft mbH (projects in Ahrensfelde, Buckow and Eberswalde) and SUN:BAR Photovoltaik Barnim GmbH (project in Bernau), which are 100% part of the municipal corporate group of Kreiswerke Barnim GmbH. Barnimer Dienstleistungsgesellschaft mbH (a 94% subsidiary of Kreiswerke Barnim and a 6% subsidiary of the district of Barnim) passes the funds raised on to its affiliated companies by means of loans.
References:
Project | Location | Year of construction | Capacity |
Ground-mounted systems | |||
Ostend landfill (all construction phases) | Eberswalde | 2020 to 2024 | 15.56 MWp |
Blinder Pfuhl landfill | Biesenthal | 2023/2024 | 1.9 MWp |
Ruhlsdorf landfill | Ruhlsdorf | 2023/2024 | 1.45 MWp |
Rooftop systems | |||
Schwärzesee primary school | Eberswalde | 2020 | 138 kWp |
Heidewald sports hall | Eberswalde | 2020 | 190 kWp |
Lunow community centre | Lunow | 2021 | 65 kWp |
Lindenberg primary school | Lindenberg | 2021 | 299 kWp |
Oderberg volunteer fire brigade | Oderberg | 2021 | 65 kWp |
Barnimer Busgesellschaft Ost | Eberswalde | 2021 | 690 kWp |
Barnimer Busgesellschaft Borsigstraße | Bernau bei Berlin | 2023 | 299 kWp |
District archive | Eberswalde | 2023 | 99 kWp |
Organisation chart

Citizens have the opportunity to participate in the “Sonnendächer im Barnim” project via DKB Crowd by means of a qualified subordinated loan totalling 625,000 euros. In the first investment phase, the offer is aimed exclusively at citizens of the district of Barnim. In the second phase, the offer will be extended to the whole of Germany. In both phases, you can grant interest-bearing subordinated loans as an investor. The interest rate is 5.0 percent per year over a term of 10 years. Repayment is made in equal instalments at the end of each year. No closing fees are payable by investors. The investment amount is limited to 25,000 euros per investor. Investments are possible from 250 euros up to 25,000 euros in steps of 50 euros. Liability is limited to the investment amount.

| Term | Interest | Repayment |
|---|---|---|
| 10 years | 5.00 % p. a. | Instalment loan |