- High-return climate protection
- Stability through a fixed feed-in tariff
- Regional, sustainable energy generation
Welcome note
.jpg)
Dear investors,
As early as the 1980s, as a young farmer, I was convinced of the potential of wind energy and put my vision into practice by equipping the farm with its first wind turbine. In this way, the farm was supplied with renewable electricity. At that time, I organised citizens’ initiatives to give local residents the chance to take part in expanding the turbines.
With Prowind GmbH, founded in 2000, the concept could be developed further and the responsibility spread across several shoulders.
Prowind has now grown to more than 180 employees and continues to specialise in community energy. In view of the challenges ahead, this focus seems more relevant than ever. Our vision is to be successful with a clear conscience and with the participation of regional partners, thereby making green energy possible for our lives.
We support every project from project conception and development through financing and construction to the smooth operation of the wind turbines.
We secure good returns by keeping the projects in our own portfolio and managing them from a single source.
Today you can take part in financing the Dingsfelde community wind farm (Wiefelstede), district of Ammerland, Lower Saxony.
Together with you, we want to advance the energy transition and, with your investment, create a future worth living in for the next generations.
Johannes Busmann
Managing Director of Dingsfelde Bürgerwindparks GmbH
Opportunities and risks
| Opportunities | Risks |
|---|---|
|
|
The Dingsfelde wind farm in the municipality of Wiefelstede, in the district of Dingsfelde, consists of three wind turbines (“WTs”) and is located in the district of Ammerland near Oldenburg. Two of the three turbines are financed by this investment (Vermögensanlage). They are WTs from the manufacturer Nordex SE of type N175-6.8 with a hub height of 179 metres, a rated output of up to 6.8 MW each and a total rated output of 13.8 MW. Commissioning is expected in the fourth quarter of 2026.
The initial permit was issued in September 2024. Subsequently, the application for an amended permit under the simplified procedure pursuant to section 16 BImSchG in conjunction with section 6 WindBG was submitted to the district of Ammerland. The amended permit was received in April 2025.
To implement the project, a general contractor agreement and an agreement on commercial and technical operational management were concluded with Prowind GmbH.
Prowind was awarded a contract for the wind farm in the Bundesnetzagentur tender at 7.17 cents/kWh. The gross remuneration of 7.33 cents/kWh (EEG award x correction factor) results from the site quality assessment.
The grid connection requirements and the grid connection commitment are already in place.
Use of funds
The community capital raised serves the project as economic equity for the construction of the wind farm. Investments of between 250 and 25,000 euros per person are possible.
Source of funds - financing structure

Project company
The owner of the wind turbines is Zehnte Bürgerwind GmbH, based in Osnabrück, Lower Saxony. The company is registered with the Osnabrück local court (Amtsgericht) under commercial register number HRB 219853. It is represented by its managing director with sole power of representation, Johannes Busmann, who has worked in the renewable energy sector with Prowind GmbH since 2000 and can draw on extensive experience.
In addition, Prowind GmbH also acts as operations manager for its own turbines and will take over the commercial operational management for the Dingsfelde wind farm. Prowind GmbH, which has realised numerous wind farms from project development through construction to operational management, will also be responsible for the technical operational management.
| Term | Interest | Repayment | Interest date | Maturity |
|---|---|---|---|---|
| 13 years | 5.00 % p. a. | Instalment loan | 31.12. annually (first on 31.12.2027) | 31.12.2038 |
| Type of loan | Instalment loan |
|---|---|
| Interest payment frequency | annually |
| Available from | 06.11.2025 |
Downloads
Your personal payment plan (5.00 % interest p. a.)
| Year | Date | Payment (gross) | Interest | Repayment | Status |
|---|
Example calculation based on the terms, without accrued interest or a different first interest period; amounts rounded. Only the loan agreement and the investment information sheet (Vermögensanlagen-Informationsblatt) are authoritative. Taxes are not taken into account.