    • Green, locally produced electricity
    • Community participation
    • Sustainable repowering

    Welcome note

    Portrait of the project developer

    Dear investors,

    Local energy transition – for as long as I can remember, in our family this has not been an empty phrase but something actively lived. Almost 40 years ago, my father founded Ökostromgruppe Freiburg, initially out of personal passion for hydropower, but then with the aim of contributing to local climate protection and a secure energy supply.
    My brother and co-managing director Lukas Schuwald and I took over this vision and are now developing it further with a highly committed team of 20 colleagues. With the help of a strong network of local partners and the financial participation of many citizens, we have planned and built around 50 wind turbines, 140 solar plants and 7 hydropower plants in the region – and we still operate them today. Numerous further projects are in planning.
    One of these projects for sustainable energy generation and for strengthening local value creation in the Black Forest is the Schwarzwaldprojekt, in which you can now take part. Two of the three wind turbines in Ettenheim/Kippenheim (Ortenau district) and Freiamt (Emmendingen district) have already been replaced by more powerful models (known as repowering); the third repowering turbine in Seelbach (Ortenau district) is currently under construction. Thanks to the infrastructure already in place, construction interventions were minimised and costs reduced.
    In total, the three turbines from the German manufacturer Enercon are expected to produce around 31 million kilowatt hours of green electricity per year – roughly equivalent to the consumption of almost 10,000 three-person households. Most of the project partners, from civil engineering and logistics planning to technical operation, are local and/or regional companies.
    Your invested citizens' capital serves as economic citizens' capital for the construction of the wind turbines – and for a secure, clean future.

    Thomas Schuwald
    Managing Partner

    Contribution to the UN Sustainable Development Goals

    • 3 wind turbines, in total approx. 31 million kWh of green electricity per year, saving approx. 30,000 t of CO2.

    • Strengthening of local value creation through local project partners, municipal levies, lease income and trade tax.

    • Strengthening of grid support, secure energy supply for the Ortenau district as a business location.

    • Affordable electricity for southern Germany, where it is needed most.

    • Green energy supply + income for municipalities from sustainable projects (wind turbines).

    • Cleanly generated energy from wind; a wind turbine pays back its energy investment within approx. 6-9 months.

    • Locally used wind energy contributes to independence from fossil-fuel energy producers.

    • Network of local partners, securing local jobs, local value creation.

    • UN Sustainable Development Goal 7
    • UN Sustainable Development Goal 8
    • UN Sustainable Development Goal 9
    • UN Sustainable Development Goal 10
    • UN Sustainable Development Goal 11
    • UN Sustainable Development Goal 12
    • UN Sustainable Development Goal 13
    • UN Sustainable Development Goal 17

    Opportunities and risks

    OpportunitiesRisks
    • Strong return over a chosen term

    • Active contribution to climate protection

    • Strengthening of local value creation

    • Risk of total loss of the subordinated loan