- Green, locally produced electricity
- Community participation
- Sustainable repowering
Welcome note

Dear investors,
Local energy transition – for as long as I can remember, in our family this has not been an empty phrase but something actively lived. Almost 40 years ago, my father founded Ökostromgruppe Freiburg, initially out of personal passion for hydropower, but then with the aim of contributing to local climate protection and a secure energy supply.
My brother and co-managing director Lukas Schuwald and I took over this vision and are now developing it further with a highly committed team of 20 colleagues. With the help of a strong network of local partners and the financial participation of many citizens, we have planned and built around 50 wind turbines, 140 solar plants and 7 hydropower plants in the region – and we still operate them today. Numerous further projects are in planning.
One of these projects for sustainable energy generation and for strengthening local value creation in the Black Forest is the Schwarzwaldprojekt, in which you can now take part. Two of the three wind turbines in Ettenheim/Kippenheim (Ortenau district) and Freiamt (Emmendingen district) have already been replaced by more powerful models (known as repowering); the third repowering turbine in Seelbach (Ortenau district) is currently under construction. Thanks to the infrastructure already in place, construction interventions were minimised and costs reduced.
In total, the three turbines from the German manufacturer Enercon are expected to produce around 31 million kilowatt hours of green electricity per year – roughly equivalent to the consumption of almost 10,000 three-person households. Most of the project partners, from civil engineering and logistics planning to technical operation, are local and/or regional companies.
Your invested citizens' capital serves as economic citizens' capital for the construction of the wind turbines – and for a secure, clean future.
Thomas Schuwald
Managing Partner
Contribution to the UN Sustainable Development Goals
3 wind turbines, in total approx. 31 million kWh of green electricity per year, saving approx. 30,000 t of CO2.
Strengthening of local value creation through local project partners, municipal levies, lease income and trade tax.
Strengthening of grid support, secure energy supply for the Ortenau district as a business location.
Affordable electricity for southern Germany, where it is needed most.
Green energy supply + income for municipalities from sustainable projects (wind turbines).
Cleanly generated energy from wind; a wind turbine pays back its energy investment within approx. 6-9 months.
Locally used wind energy contributes to independence from fossil-fuel energy producers.
Network of local partners, securing local jobs, local value creation.
Opportunities and risks
| Opportunities | Risks |
|---|---|
|
|
Sustainable energy generation and the strengthening of local value creation in the Black Forest – that is what FHE Windkraft GmbH und Co. KG has set out to achieve.
The company, which consists of local energy transition pioneers, operates two repowered wind turbines built in 2025 in Ettenheim/Kippenheim and in Freiamt; a third turbine in Seelbach (Ortenau district) has been under construction since spring 2026. Thanks to the infrastructure already in place, construction-related interventions could be minimised and costs reduced.
In total, the three turbines from the German manufacturer Enercon are expected to produce around 31 million kilowatt hours of green electricity per year – roughly equivalent to the consumption of almost 10,000 three-person households. The project partners, from civil engineering and logistics planning to technical operation, are for the most part local companies.
Ökostromgruppe Freiburg, which also develops and operates the three repowered wind turbines of FHE KG, has been implementing similar energy transition projects in the Black Forest for almost 40 years: with the help of a strong network of local partners, it has developed and built around 40 wind turbines, 140 solar installations and 7 hydropower plants in the region – and still operates them today.
As citizens, you have the opportunity to take part in this Black Forest project. Your invested citizen capital serves as economic citizen capital for the construction of the wind turbines.
Use of funds
The citizen capital raised contributes to the construction of the wind turbines.
Project company
FHE Windkraft GmbH und Co. KG already operates two repowered wind turbines in the Central Black Forest, and a third is currently under construction. The company consists of a handful of highly committed energy transition pioneers. Management and technical operation of the turbines are handled by Ökostromgruppe Freiburg, which has for almost 40 years been the leading company in the Black Forest implementing wind energy projects. The managing partners are the brothers Thomas and Lukas Schuwald.
Total amount: 2.4 million
Interest and repayment payments: 5%, annually
Repayment date: annually on 31.12., annually for up to 10 years
Term: 10 years
Special features: none
| Term | Interest | Repayment | Interest date | Maturity |
|---|---|---|---|---|
| 10 years | 5.00 % p. a. | in equal instalments | 31.12. annually (first on 31.12.2026) | 31.12.2036 |
| Type of loan | in equal instalments |
|---|---|
| Interest payment frequency | annually |
| Available from | 22.06.2026 |
Downloads
Your personal payment plan (5.00 % interest p. a.)
| Year | Date | Payment (gross) | Interest | Repayment | Status |
|---|
Example calculation based on the terms, without accrued interest or a different first interest period; amounts rounded. Only the loan agreement and the investment information sheet (Vermögensanlagen-Informationsblatt) are authoritative. Taxes are not taken into account.